E-mail:sales1@zhrollformingmachine.com

Cangzhou ZhongHeng Machine Manufacture Co.,ltd
Home > Product > Roller Shutter Door Forming Machine , Door Frame Machine > Door Frame Machine
Custom Design Steel Door Frame Roll Forming MachineCustom Design Steel Door Frame Roll Forming MachineCustom Design Steel Door Frame Roll Forming MachineCustom Design Steel Door Frame Roll Forming MachineCustom Design Steel Door Frame Roll Forming MachineCustom Design Steel Door Frame Roll Forming MachineCustom Design Steel Door Frame Roll Forming MachineCustom Design Steel Door Frame Roll Forming Machine

Product Name:Custom Design Steel Door Frame Roll Forming Machine

Components:Decoiler, Main Machine, PLC, Hydraulic System, Run out Table

Inquire Now

None

None

Custom Design Steel Door Frame Roll Forming Machine

Our steel door frame Roll Forming Machine, it can be customized to make the door frames as you need. And our door frame machine can make many types door frames just in one machine in batch. The whole process is full automatic, it can save your energy and time. There are some popular profiles of door frame in the followings.

Custom Design Steel Door Frame Roll Forming MachineCustom Design Steel Door Frame Roll Forming Machine


Technique parameters of the processing line

(1) Suitable material: Galvanized steel

(2) Thickness of the plate: 1.2mm-1.5

(3) Final Profile: As above

(4) Productivity: 25m/min

(5) Roller steps: 20 rows

(6) Roller material: 45# steel Forming mold material is Cr15 heat treated HRC54-56.

(7) Diameter of active shaft: 50mm

(8) Main power: 11kw JZQ250 Reducer gear transmission

(9) Cutting system: non-stop hydraulic cutting

(10) pump power is 5.5kw

(12) control system: PLC control Delta Brand

(13) Twist leveling

3. Components of line:

No.NameUnitQty
1Decoilerset1
2Main machine for roll formingset1
3Control systemset1
4Hydraulic systemset1
5Hydraulic  Post cutset1
6Output tableset1

Trade Terms

1. Price: FOB or CFR

2. Payment Term: 30% T/T in advance, 70% T/T before shipment

3. Delivery Time: within 40 Days after receipt of the down payment

4. Warranty: 1 year

5. Installation and Commissioning:

We can send our engineers to customers' site to assist on the installation, commission and trainning to workers.The customer is required to pay 100USD/day to each engineer and afford the food & accommodation and the round-trip tickets.

Installation and Trainning Days: about 3-5 days


Copyrights © Cangzhou ZhongHeng Machine Manufacture Co.,ltd All Rights Reserved   

Sitemap

Top
+0086 151 337 11731
1