E-mail:sales1@zhrollformingmachine.com
Components:Decoiler, Main Machine, PLC, Hydraulic System, Run out Table
914 Feeding Shutter door roll forming machine
Machine Specifications
1. | Power requirement | Type | 380v/3ph/50hz | |
Main Motor power | 4kw | |||
Cutter power | 4kw | |||
2. | Forming speed(m/min) | 15m/min max | Not include the time of cutting | |
3. | Forming stations | 26 stations | ||
4. | Thickness of Mild steel | 0.3-0.8mm | ||
5. | Material of rollers | CR15 | ||
6. | Thickness of structure | 20mm | ||
7 | Forming shaft diameter(mm) | 70 | ||
8 | Drive | Gear | ||
9 | Type of cutting | Hydraulic cutting | ||
10. | Control system | PLC and inverter control | ||
11. | Install dimension(depend on the final design) | 11.8m×1.6m×1.5m | Without panel length | |
12. | Total weight (Approx) | 5.6T | Depend on final design | |
13. | Screen | Text screen/touch screen |
For the High Quality Roller Shutter Door Forming Machine ,it is a machine will make shutter door slats, Our machine can do thickness for 0.3-1.8mm, the shape will be design by your demand.
High Quality Roller Shutter Door Forming Machine Components
1. Decoiler the coil.
2.Feeder to the punching holes machine(it can make the shutter door slide cover with holes).
3.Roll forming part, for our mahcine, the forming speed will be 0-30m/min, it is asjustable.Generally we will make the Fireproof Steel Roller Shutter Slat Making Machinee with gear drive, it will give machie a strong power to move.
4.Punching the lock holes. This part will together with cutting blade. When it cutting, the machine will punching the holes together.
5.Cutting part. We have two types of cutter for you choose,one is fly saw,another is hydraulic cutter.
Trade Terms
1. Price: FOB or CFR
2. Payment Term: 30% T/T in advance, 70% T/T before shipment
3. Delivery Time: within 40 Days after receipt of the down payment
4. Warranty: 1 year
5. Installation and Commissioning:
We can send our engineers to customers' site to assist on the installation, commission and trainning to workers.The customer is required to pay 100USD/day to each engineer and afford the food & accommodation and the round-trip tickets.
Installation and Trainning Days: about 3-5 days
Copyrights © Cangzhou ZhongHeng Machine Manufacture Co.,ltd All Rights Reserved